Son Font Progress, early March 2026
Duration: 4 minutes

A quick look around the latest changes as hopefully the bad weather disappears. Concentrating mainly on work to the construction of the east exterior stairway, the changes to the south terrace and the building of the block walls on the south side of the first floor.